Resource Information - Alkane Resources Ltd
Level 12, 37 Bligh Street +61 2 8233 6168 contact@irmau.com

Dubbo Project Mineral Resources (as at 30 June 2017)

The reportable Dubbo Project Mineral Resources are based on the open pittable Toongi deposit, which has a depth extent of 115 metres below surface. These Mineral Resources are wholly inclusive of Ore Reserves, which are based on economic parameters applied to the Mineral Resources, reflecting an initial project horizon of 20 years.

Resource Category Tonnes
(Mt)
ZrO2
(%)
HfO2
(%)
Nb2O5
(%)
Ta2O5
(%)
Y2O3
(%)
TREO*
(%)
Measured 42.81 1.89 0.04 0.45 0.03 0.14 0.74
Inferred 32.37 1.90 0.04 0.44 0.03 0.14 0.74
Total 75.18 1.89 0.04 0.44 0.03 0.14 0.74
*TREO% is the sum of all rare earth oxides excluding ZrO2, HfO2, Nb2O3, Ta2O5, Y2O3,

Dubbo Project Ore Reserves (as at 30 June 2017)

Reserve Category Tonnes
(Mt)
ZrO2
(%)
HfO2
(%)
Nb2O5
(%)
Ta2O5
(%)
Y2O3
(%)
TREO*
(%)
Proved 18.90 1.85 0.04 0.440 0.029 0.136 0.735
Probable 0
Total 18.90 1.85 0.04 0.440 0.029 0.136 0.735
*TREO% is the sum of all rare earth oxides excluding ZrO2, HfO2, Nb2O3, Ta2O5, Y2O3,

Ore Reserves and Mineral Resources for the Dubbo Project are reported in accordance with the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012). These estimates, provided by independent industry consultants Mining One Pty Ltd, take into account revised engineering, costings and revenue data, and were reported to the ASX on 19 September 2017.